Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 30 results ...

Abdelaty, A F A (2017) Data-driven algorithms for enhanced transportation infrastructure asset management, Unpublished PhD Thesis, , Iowa State University.

Al Shalabi, F A (2016) BIM framework for energy and maintenance performance assessment for facility management, Unpublished PhD Thesis, , Iowa State University.

AlBughdadi, A J M (2022) Advanced decision support tools for bridge asset management, Unpublished PhD Thesis, , Iowa State University.

Azmy, N (2012) The role of team effectiveness in construction project teams and project performance, Unpublished PhD Thesis, Civil, Construction, and Environmental Engineering, Iowa State University.

Barbosa Resende, C (2021) Post-construction evaluation for work zones and construction engineers' training, Unpublished PhD Thesis, Civil, Construction, and Environmental Engineering, Iowa State University.

Barutha, P J (2018) Integrated project delivery for industrial projects, Unpublished PhD Thesis, , Iowa State University.

Canales Fernandez, A R (2004) Developing effective integration between American supervisors and hispanic craft workers in construction, Unpublished PhD Thesis, , Iowa State University.

Christensen, A N (2019) Identifying private construction project owner inefficiencies that affect project goals, Unpublished PhD Thesis, , Iowa State University.

El-adaway, I H (2008) Construction dispute mitigation through multi-agent based simulation and risk management modeling, Unpublished PhD Thesis, , Iowa State University.

Elmisalami, T E (2001) Developing a multi-attribute utility model (MAUM) for selecting information technologies in the construction industry, Unpublished PhD Thesis, , Iowa State University.

Enz, D L (2009) Construction project administration and management for mitigating work zone crashes and fatalities: An integrated risk management model, Unpublished PhD Thesis, , Iowa State University.

Gad, G M (2012) Effect of culture, risk, and trust on the selection of dispute resolution methods in international construction contracts, Unpublished PhD Thesis, , Iowa State University.

Gao, Z (2004) Investigation of technologies to improve the visualization of design documents and construction process, Unpublished PhD Thesis, Civil, Construction, and Environmental Engineering, Iowa State University.

Harmelink, D J (1995) Linear scheduling model: The development of a linear scheduling model with microcomputer applications for highway construction project control, Unpublished PhD Thesis, , Iowa State University.

Kaewmoracharoen, M (2009) Feasibility of visualization and simulation applications to improve work zone safety and mobility, Unpublished PhD Thesis, Civil, Construction, and Environmental Engineering, Iowa State University.

Kawal, D E (1970) A systems model of a construction firm, Unpublished PhD Thesis, , Iowa State University.

Lueth, P L O (2008) The architectural design studio as a learning environment: A qualitative exploration of architecture design student learning experiences in design studios from first- through fourth-year, Unpublished PhD Thesis, , Iowa State University.

Mahfouz, T S (2009) Construction legal support for differing site conditions (DSC) through statistical modeling and machine learning (ML), Unpublished PhD Thesis, , Iowa State University.

McCann, M (1986) An application of convex programming to construction scheduling, Unpublished PhD Thesis, Industrial and Manufacturing Systems Engineering, Iowa State University.

Mohd Zainudin, N (2019) Identification and analysis of worker safety hazards in Midwest agribusiness construction work sites, Unpublished PhD Thesis, Agricultural and Biosystems Engineering, Iowa State University.

Nahvi, A (2019) Integrated stochastic economics performance evaluation of horizontal infrastructure systems, Unpublished PhD Thesis, , Iowa State University.

Pinto Nunez, M D C (2017) Comprehensive partnering management model for highway construction projects delivered using traditional and alternative methods, Unpublished PhD Thesis, , Iowa State University.

Rahbar, F (1997) Computer-aided parametric planning (CAPP), Unpublished PhD Thesis, , Iowa State University.

Rueda-Benavides, J A (2016) Indefinite delivery/indefinite quantity project selection framework using stochastic techniques, Unpublished PhD Thesis, , Iowa State University.

Shrestha, K P (2016) Data analytics and visualization for enhanced highway construction cost indexes and as-built schedules, Unpublished PhD Thesis, , Iowa State University.

Sirotiak, T L (2008) The effect of problem/project-based learning on a desired skill set for construction professionals, Unpublished PhD Thesis, , Iowa State University.

Smadi, O G (2000) Knowledge-based expert system pavement management optimization, Unpublished PhD Thesis, , Iowa State University.

Talbot, J (2021) Understanding housing reconstruction in Puerto Rico after hurricanes Irma and Maria, Unpublished PhD Thesis, , Iowa State University.

Tapia, R M (2017) Linear scheduling and procurement tools to manage geotechnical risk in design-build construction projects, Unpublished PhD Thesis, Civil, Construction, and Environmental Engineering, Iowa State University.

Woldesenbet, A (2014) Highway infrastructure data and information integration & assessment framework: a data-driven decision-making approach, Unpublished PhD Thesis, Civil, Construction, and Environmental Engineering, Iowa State University.